Crane work with 650-tonne pneumatic crane for sustainable waste recycling
EMIL EGGER has developed for the operator GEVAG – SMARTE ENERGIE. FROM WASTE. – large plant components, including a filter...
10th place in the transport and logistics sector in the whole of Switzerland
EMIL EGGER transports Siemens Energy turbine from Czechia to Switzerland and lifts up to 66 tonnes with precision.
EMIL EGGER has developed for the operator GEVAG – SMARTE ENERGIE. FROM WASTE. – large plant components, including a filter...
The old SBB underpass “Büchliweg” was lifted with a stacking system (jack-up system) and moved out directly on self-propelled modular...
On August 4, we welcomed 11 new apprentices to our Härkingen and St. Gallen locations.
In the night of 04. The third and final major crane lift as part of the bridge replacement project in...
Get the epitome of technical model making: The mobile crane from WSI in the EMIL EGGER fleet design on a...
Four new ENERCON wind turbines commissioned by EW Ursern and Energie Uri (EWA) for Andermatt are really getting things moving...
Four new ENERCON wind turbines commissioned by EW Ursern and Energie Uri (EWA) for Andermatt are really getting things moving...
For the waste water purification plant in Thalwil, our team moved a 3.5 t clarifier screen with a radius of...
EMIL EGGER, a specialist in the transport and storage of general cargo, long goods and heavy goods, currently has free...
We successfully installed a new Mikron UCP 600 Vario milling center in the basement of the company building of Polycontact...
What does the blind spot feel like from a truck driver’s perspective? This impressive experience was recently shared with over...
At the end of June, SBB reached an important milestone for the infrastructure in Monthey: the new SBB bridge over...
In the night from Monday to Tuesday, EMIL EGGER AG was able to realize an extraordinary transport project: The approximately...
This week, EMIL EGGER was able to realize a very special project in Basel: The transportation of the new boathouse...
As part of a challenging infrastructure project, EMIL EGGER was able to make a key contribution to the replacement of...
Last Monday morning, we were able to accompany a very special moment with our crane logistics: After several months of...
With the “e-construction site” project, the city of Zurich is pursuing the goal of testing the use of electrically powered...
EMIL EGGER at work on a challenging infrastructure project for Appenzeller Bahnen.
On the weekend of 22/23 March 2025, a significant milestone was reached in the renovation of the Reussbrücke Fluhmühle bridge...
For the packaging and molded parts manufacturer Taracell AG in Künten, we mastered a challenging heavy goods logistics task.
EMIL EGGER is present at strategically important places. This makes it possible to offer the customer an optimal service. In addition, this prevents unnecessary long journeys to customers, which in turn is in line with our environmental concept of reducing CO² emissions.
You need to load content from reCAPTCHA to submit the form. Please note that doing so will share data with third-party providers.
More InformationYou are currently viewing a placeholder content from Facebook. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More InformationYou are currently viewing a placeholder content from Instagram. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More InformationYou are currently viewing a placeholder content from reCAPTCHA. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More InformationYou are currently viewing a placeholder content from X. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More Information