Heavy lifting

Much more than moving heavy cargo

The market for heavy cargo logistics and heavy lifting technology is subject to special framework conditions and requires a high degree of trust. Lifting and transporting heavy goods therefore requires a reliable and professional solution. EMIL EGGER is the suitable partner for this and offers a full-service concept from a single source. We are your partner for lifting, moving, lowering and dismantling any lifting material and loads up to several thousand tonnes.
emil-egger-ag-andreas-schoenenberger-projektleiter-schwergutlogistik

GET ADVICE WITHOUT OBLIGATION NOW

PROFESSIONAL EXCHANGE IS ALWAYS WORTHWHILE

“Are you in the process of planning your heavy cargo project? We would be happy to support you with a non-binding conversation. To help you make the right decisions now and successfully complete key milestones, we share our expertise and experience with you.”

Andreas Schönenberger
Project Manager Crawler Cranes & Heavy Lifting

Full-Service

  • Individual, economical and customer-optimized solutions
  • Creation of bases for variant decisions
  • Project planning and engineering
  • Transport, insertion and assembly as part of the full-service concept
  • Optimal equipment (strand jacks, shifting units, mobile & crawler cranes, lifting systems, SPMT)

OVERVIEW ETE VEHICLE FLEET

TECHNICAL MANUAL

In order to be able to quickly evaluate the suitable devices, the technical manual is available with a practical overview index. Digitally also available as an interactive PDF. On more than 300 pages you will find our heavy cargo range at a glance including technical drawings & dimension tables. Our project managers are available to provide you with further information.

The entire vehicle fleet in the practical e-paper
emil-egger-technisches-handbuch-kran-hebebuehne-logistik-schwergut-pneukran-mobilkran-lkw-kran-

Benefit from the experience of our specialists

Contact person in the field of heavy lifting
Michael Dudler

Michael Dudler

Division Manager Heavy Cargo
Management

Dipl. Civil Engineer HTL/FH / Dip. Wirtschaftsing. GH/EMBA

  • Several years of experience in heavy load logistics (mobile & crawler cranes, special transports, heavy lifting)
  • Many years of experience or activity in project and technical management in bridge construction and deconstruction
  • Design and construction of formwork, falsework and special scaffolding (composite formwork carriages, feed and free-assembly scaffolding, climbing formwork, etc.)
Andreas Schönenberger

Andreas Schönenberger

Projekt Lead crawler cranes & heavy lifting
Crane work

BSc Mechanical Engineering ZFH

  • Several years of experience in heavy cargo logistics (mobile & crawler cranes, special transports, lifting & sliding technology)

PRECISION AND RELIABILITY APPRECIATED THROUGHOUT SWITZERLAND

IMPRESSIONS FROM THE LIFTING AND SLIDING APPLICATIONS

Push-pull units

Displacement pedestrian underpass

Shift 1500 tons

HEAVY CARGO EMPLOYEES
216
HEAVY CARGO OPERATIONS P.A.
40,000
HEAVY CARGO VEHICLES
295

HEAVY GOODS PROFESSIONAL EMIL EGGER

Bild 1
750-metric-ton crawler crane for the new SBB Aare Bridge in Solothurn
With cantilevers extending up to 108 meters, EMIL EGGER supported the assembly of the new steel structure for the SBB Aare Bridge in Solothurn. A total of eleven bridge elements, weighing up to 71 metric tons each, were hoisted into place.
Learn more
714026805_Biel_Heidenweg_Brücke_Einhebung_150dpi_0790_D
Tandem lift using a 650-tonne and a 450-tonne mobile crane
Following the successful dismantling in June, the next milestone in the refurbishment of the Heideweg Bridge in Biel was reached in September: the new central section of the bridge was hoisted into place over Bernstrasse at the Brüggmoos junction.
Learn more
emil-egger-bahnbrücke-wetzikon-sbb-b
LR 11000 lifts new railway bridge into place in Wetzikon
The EMIL EGGER Group’s most powerful crawler crane was deployed during the replacement of the railway bridge over Usterstrasse in Wetzikon. After lifting two abutments, each weighing 210 tonnes, the new steel bridge, weighing 160 tonnes, was precisely positioned at its intended location.
Learn more
default
1,200-tonne railway underpass in Niederbipp postponed
As part of the refurbishment of the Scharnageln–Niederbipp section of the Aare Seeland mobil AG railway line, EMIL EGGER was able to support a challenging project involving heavy-lift logistics, lifting and relocation technology.
Learn more
Bild 1v5
Demolition work using the 450-metric-tonne mobile crane in Biel
During the night of 16 to 17 June 2026, EMIL EGGER was involved in the dismantling of the Heideweg Bridge in Biel. As part of the ongoing renovation work, the central section of the bridge over Bernstrasse at the Brüggmoos junction was dismantled.
Learn more
26-05-12-3214
Precise crane operation in winter conditions
As part of the construction of the new Säntis suspension railroad, EMIL EGGER was once again able to make a contribution to an important infrastructure project in Eastern Switzerland. Together with the fitters from Garaventa, the existing cabins of the Säntis suspension railroad were safely lifted down into the valley.
Learn more
emil-egger-reussbruecke-kranhub-thb-spezialtransporte-1
Precision in time with rail traffic
On the first weekend in May, EMIL EGGER successfully completed another important construction phase on the Reuss Bridge in Lucerne. The listed railroad bridge – over which around 200 trains pass every day – is currently being extensively renovated. The last major renovation was carried out in 1987.
Learn more
emil-egger-seftausteg-bern-4
Efficient lifting technology from EMIL EGGER for bridge renovation in Bern
The Seftau footbridge in Felsenau near Bern was successfully excavated on April 28, 2026. The 53-metre-long foot and cycle bridge connects the municipalities of Bern and Bremgarten bei Bern and is currently undergoing extensive renovation.
Learn more
emil-egger-rueckbau-wallstrassenbruecke-ulm-lr11000-22
When logistics moves mountains: EMIL EGGER brings a 1,000-tonne crane to the construction site
Before a large crawler crane even makes its first lift, an impressive logistical feat has already taken place. A crane such as the Liebherr LR 11000 is completely dismantled for transport and delivered to the construction site in numerous individual parts.
Learn more
emil-egger-rueckbau-wallstrassenbruecke-ulm-lr11000-2
Demolition of the Wallstrasse Bridge in Ulm – Video footage of the operation
A few days ago, we reported on our involvement in the demolition of the Wallstrasse Bridge in Ulm. Now, video footage provides further insights into this extraordinary project and impressively demonstrates the scale and precision of the work carried out.
Learn more