Lift & Place

LIFTING AND TRANSPORTING SPECIAL SIZES WITH LOADER CRANE

With our powerful loader cranes (20 to 100 mt lifting capacity), we not only transport your goods, but at the same time ensure independent and professional loading or unloading. Thanks to the right equipment and our well-trained truckers, we also place the transported goods at the desired position with great accuracy, if desired.

This way, we offer our customers an efficient and complete service. The ideal solution when transporting machinery, equipment and other bulky or heavy goods.
EMIL EGGER AG Logistik Schweiz Martin Aregger Niederlassungsleiter Härkingen

FLEXIBLE FULL SERVICE

OUR DRIVERS MASTER THE CRANES JUST AS PRECISELY AS THEIR TRUCKS

“We load by ourselves, reliably drive to any destination and place your cargo exactly to the millimeter where it is needed. Our drivers are trained professionals and are as expert at crane work as they are at trucking.”

Martin Aregger
Branch Manager Härkingen

EMIL EGGER – YOUR CRANE PARTNER IN SWITZERLAND

OUR LOADER CRANES FLEET
  • Crane extension/reach up to 37 m
  • Load capacity up to 100 mt
  • Closed trucks with canvas or tarpaulin tops
  • Vehicles with open loading area
  • Cargo securing equipment
  • Slings: Hangers
  • Accessories: pallet forks, suction systems, traverses, grippers

The combination of transport and crane work simplifies logistical work processes enormously. Our fleet consists of medium and large crane vehicles (23 mt to 100 mt). Combinations with trailers and semi-trailers as well as various accessories provide the best conditions for every application. In total, EMIL EGGER has 28 truck-mounted cranes. Depending on the weight, size and destination, we will be happy to advise you which truck crane is best suited for your specific case.

Our drivers at their daily work

YouTube

By loading the video, you agree to YouTube's privacy policy.
Learn more

Load video

Transport and place large general cargo with truck crane

WE ARE HERE FOR YOU

CONTACT US
TRUCK CRANES
26
MAX. LOAD CAPACITY MT
100
MAXIMUM RANGE
37

Complete logistic solutions provider for any size of cargo

Our goal: Your recommendation
Spychertransport – Rüfenacht-Worb – Jugendarbeit Worb
EMIL EGGER moves history
In the night from Monday to Tuesday, EMIL EGGER AG was able to realize an extraordinary transport project: The approximately 250-year-old Aebersold warehouse was saved from imminent demolition and transported to its new destination at the Freizeithaus in Worb.
Learn more
emil-egger-spezialtransport-kranarbeiten-bootshaus-104101
Special transport Basel: EMIL EGGER brings 50-ton boathouse to its destination
This week, EMIL EGGER was able to realize a very special project in Basel: The transportation of the new boathouse for the emergency services of the canton of Baselland.
Learn more
emil-egger-spmt-verschub–2
Efficient bridge replacement for the ASTRA in Bursins (VD) with SPMT
As part of a challenging infrastructure project, EMIL EGGER was able to make a key contribution to the replacement of an overpass over the A1 highway between Lausanne and Geneva. The client was the Federal Roads Office FEDRO, in collaboration with Implenia Schweiz AG as the master builder.
Learn more
schoenausteg-kranlogistik-emil-egger
Popular Schönausteg in Bern back in its old place
Last Monday morning, we were able to accompany a very special moment with our crane logistics: After several months of renovation, the listed Schönausteg in Bern was lifted back into its original position above the River Aare.
Learn more
default
Successful reinstallation of the Sitter Bridge in Appenzell
EMIL EGGER at work on a challenging infrastructure project for Appenzeller Bahnen.
Learn more
default
185 tons of Reuss bridge on the hook
On the weekend of 22/23 March 2025, a significant milestone was reached in the renovation of the Reussbrücke Fluhmühle bridge in Lucerne: the first of three bridge sections was successfully lifted out – an impressive 185 tons of steel were suspended from the 1000 t crawler crane with an 84 m jib!
Learn more
emil-egger-industrieumzug-schwergut-logistik-maschine
Precision and teamwork for machine relocation in Künten
For the packaging and molded parts manufacturer Taracell AG in Künten, we mastered a challenging heavy goods logistics task.
Learn more
1emil-egger-rueckbau-bruecke-hanau-raupenkran-2025-19
Dismantling of the B43 bridge over the DB facilities in Hanau
Work began on December 2, 2024 and is scheduled to be completed by March 2025. The first construction phase had its intensive phase in the last week of December. The second intensive phase will now follow over the next few weeks.
Learn more
emil-egger-muttenz-überfuehrung-kranarbeiten-2
Successful dismantling weekend in Muttenz
Last weekend we were able to complete the crane work for the dismantling of the Grenzacherstrasse overpass in Muttenz.
Learn more
emil-egger-tunnelbohrmaschine-gotthardtunnel-spezialtransport 5
Special transportation of large and heavy parts of a tunnel boring machine
Last week, EMIL EGGER AG delivered two of the largest and heaviest parts of the tunnel boring machine for the second tube of the Gotthard tunnel.
Learn more