Storage

OUTDOOR STORAGE AND HEAVY GOODS HALLS WITH INDOOR CRANE

We have the right warehouse for every good. Customers throughout Switzerland can book available storage space with us. All our storage areas are equipped with the latest technology and special equipment. EMIL EGGER is THE storage specialist for the storage of heavy cargo, machines, railroad wagons or generally oversized goods.

PROFESSIONAL AND SAFE STORAGE OF HEAVY AND LARGE GOODS

Unsere eigenen und spezifisch für Schwergüter ausgelegten Lagerhäuser sind in der ganzen Schweiz verteilt und somit immer in Ihrer Nähe. Insgesamt stehen nur schon für Schwergüter über 40‘000 m² Lagerfläche zur Verfügung. Damit ist ETE auch im Lagerbereich der leistungsfähigste Logistiker im Land.

Zusammen mit den weiteren Palettenlagern bietet EMIL EGGER AG Flächen von rund 200‘000 m². Hohe Bodenbelastungen und Hallenkrananlagen bis über 60 t sind Standard. Sämtliche Lagerhallen sind nach neusten Normen gebaut und bei Bedarf auch geheizt. Ebenso verfügt ETE über grosszügige Aussenlager.

Zusätzlich lässt die Flexibilität der EMIL EGGER Lagerinfrastruktur den Kunden grösstmöglichen Spielraum und spart Kosten. Unsere Kunden bezahlen immer nur soviel Lagerfläche, wie sie tatsächlich benötigen. Bedarfsorientiert können sie kurz-, mittel- oder langfristig mieten.

Wir schaffen mit unseren Services Freiraum für unsere Kunden und spielen ihre Ressourcen frei für das Kerngeschäft.
Unsere Spezialfahrzeuge übernehmen zudem auf Wunsch den An- bzw. Abtransport von Gütern wie Maschinen, Anlagen, Transformatoren, Kabelrollen, Containern etc.

HEAVY GOODS STORAGE AREA IN M²
40,000
Mobile cranes
37
CRAWLER CRANES
10
emil-egger-ag-michael-dudler-geschaeftsleitung-bereichsleiter-schwergut

STORAGE SPECIALIST FOR OVERSIZED CARGO

PROFESSIONAL STORAGE ON REQUEST INCLUDING TRANSPORT

“Our heavy lift warehouses are conveniently located and have the necessary infrastructures and trained personnel to carry out storage in a professional as well as safe manner. Upon request, we also provide round-trip transportation or transportation to the destination.”

Michael Dudler
Division Manager Heavy Lift Logistics, Member of the Executive Board

THE NUMBER 1 IN HEAVY LIFT LOGISTICS IN SWITZERLAND

Our goal: Your recommendation
Bild 1
750-metric-ton crawler crane for the new SBB Aare Bridge in Solothurn
With cantilevers extending up to 108 meters, EMIL EGGER supported the assembly of the new steel structure for the SBB Aare Bridge in Solothurn. A total of eleven bridge elements, weighing up to 71 metric tons each, were hoisted into place.
Learn more
714026805_Biel_Heidenweg_Brücke_Einhebung_150dpi_0790_D
Tandem lift using a 650-tonne and a 450-tonne mobile crane
Following the successful dismantling in June, the next milestone in the refurbishment of the Heideweg Bridge in Biel was reached in September: the new central section of the bridge was hoisted into place over Bernstrasse at the Brüggmoos junction.
Learn more
emil-egger-bahnbrücke-wetzikon-sbb-b
LR 11000 lifts new railway bridge into place in Wetzikon
The EMIL EGGER Group’s most powerful crawler crane was deployed during the replacement of the railway bridge over Usterstrasse in Wetzikon. After lifting two abutments, each weighing 210 tonnes, the new steel bridge, weighing 160 tonnes, was precisely positioned at its intended location.
Learn more
default
1,200-tonne railway underpass in Niederbipp postponed
As part of the refurbishment of the Scharnageln–Niederbipp section of the Aare Seeland mobil AG railway line, EMIL EGGER was able to support a challenging project involving heavy-lift logistics, lifting and relocation technology.
Learn more
Bild 1v5
Demolition work using the 450-metric-tonne mobile crane in Biel
During the night of 16 to 17 June 2026, EMIL EGGER was involved in the dismantling of the Heideweg Bridge in Biel. As part of the ongoing renovation work, the central section of the bridge over Bernstrasse at the Brüggmoos junction was dismantled.
Learn more
26-05-12-3214
Precise crane operation in winter conditions
As part of the construction of the new Säntis suspension railroad, EMIL EGGER was once again able to make a contribution to an important infrastructure project in Eastern Switzerland. Together with the fitters from Garaventa, the existing cabins of the Säntis suspension railroad were safely lifted down into the valley.
Learn more
emil-egger-reussbruecke-kranhub-thb-spezialtransporte-1
Precision in time with rail traffic
On the first weekend in May, EMIL EGGER successfully completed another important construction phase on the Reuss Bridge in Lucerne. The listed railroad bridge – over which around 200 trains pass every day – is currently being extensively renovated. The last major renovation was carried out in 1987.
Learn more
emil-egger-seftausteg-bern-4
Efficient lifting technology from EMIL EGGER for bridge renovation in Bern
The Seftau footbridge in Felsenau near Bern was successfully excavated on April 28, 2026. The 53-metre-long foot and cycle bridge connects the municipalities of Bern and Bremgarten bei Bern and is currently undergoing extensive renovation.
Learn more
emil-egger-rueckbau-wallstrassenbruecke-ulm-lr11000-22
When logistics moves mountains: EMIL EGGER brings a 1,000-tonne crane to the construction site
Before a large crawler crane even makes its first lift, an impressive logistical feat has already taken place. A crane such as the Liebherr LR 11000 is completely dismantled for transport and delivered to the construction site in numerous individual parts.
Learn more
emil-egger-rueckbau-wallstrassenbruecke-ulm-lr11000-2
Demolition of the Wallstrasse Bridge in Ulm – Video footage of the operation
A few days ago, we reported on our involvement in the demolition of the Wallstrasse Bridge in Ulm. Now, video footage provides further insights into this extraordinary project and impressively demonstrates the scale and precision of the work carried out.
Learn more