General Terms and Conditions of EMIL EGGER AG

Transparency and legal clarity

Our General Terms and Conditions simplify cooperation, reduce risks and create a uniform and detailed regulation of legal relations. We kindly ask you to read them before concluding the contract and, in case of any ambiguities, to exchange information with the respective contact person.
Internationale Spedition Schweiz EU EMIL EGGER Logistik
Road transport

GTC for the regulation of road transports of EMIL EGGER AG in Switzerland and Liechtenstein.

GTC
Wechselpritschen Vermietung EMIL EGGER
Swap-bodies rental

General terms and conditions for the rental of swap-bodies of EMIL EGGER AG.

GTC
EMIL EGGER Hebebühnen Arbeitsbühnen Vermietung Service Logistik Schweiz
Aerial platforms rental

General terms and conditions for the rental of aerial platforms or working platforms of EMIL EGGER AG.

GTC
Brückenmontage Paserelle Transport Montage Heben Platzieren Schwergut Logistik EMIL EGGER
Crane work & industrial removals

General terms and conditions for crane work and industrial relocations of EMIL EGGER AG.

GTC
Rhätische Bahn ersetzt drei alte Stahlbrücken - EMIL EGGER übernimmt Kranarbeiten
Crawler cranes additional conditions

The additional conditions for crawler cranes apply in addition to the valid GTC for crane work and industrial removals.

GTC
Hebe- und Verschiebetechnik Litzenheber EMIL EGGER Schwergut Logistik
Heavy Lifting

General terms and conditions for lifting and shifting technology in the heavy cargo sector of EMIL EGGER AG.

GTC
Freie Lagerflächen EMIL EGGER Logistik
Warehouse management

GTC for storage of all kinds of goods, related manipulations, incoming and outgoing, as well as special services.

GTC

ALWAYS WELL INFORMED

COMPANY NEWS EMIL EGGER
26-05-12-3214
Precise crane operation in winter conditions
As part of the construction of the new Säntis suspension railroad, EMIL EGGER was once again able to make a contribution to an important infrastructure project in Eastern Switzerland. Together with the fitters from Garaventa, the existing cabins of the Säntis suspension railroad were safely lifted down into the valley.
Learn more
emil-egger-reussbruecke-kranhub-thb-spezialtransporte-1
Precision in time with rail traffic
On the first weekend in May, EMIL EGGER successfully completed another important construction phase on the Reuss Bridge in Lucerne. The listed railroad bridge – over which around 200 trains pass every day – is currently being extensively renovated. The last major renovation was carried out in 1987.
Learn more
emil-egger-seftausteg-bern-4
Efficient lifting technology from EMIL EGGER for bridge renovation in Bern
The Seftau footbridge in Felsenau near Bern was successfully excavated on April 28, 2026. The 53-metre-long foot and cycle bridge connects the municipalities of Bern and Bremgarten bei Bern and is currently undergoing extensive renovation.
Learn more
emil-egger-rueckbau-wallstrassenbruecke-ulm-lr11000-22
When logistics moves mountains: EMIL EGGER brings a 1,000-tonne crane to the construction site
Before a large crawler crane even makes its first lift, an impressive logistical feat has already taken place. A crane such as the Liebherr LR 11000 is completely dismantled for transport and delivered to the construction site in numerous individual parts.
Learn more
emil-egger-rueckbau-wallstrassenbruecke-ulm-lr11000-2
Demolition of the Wallstrasse Bridge in Ulm – Video footage of the operation
A few days ago, we reported on our involvement in the demolition of the Wallstrasse Bridge in Ulm. Now, video footage provides further insights into this extraordinary project and impressively demonstrates the scale and precision of the work carried out.
Learn more
default
Heavy-lift logistics for energy infrastructure – project in Niederwil, Aargau
Since the start of the year, we have been responsible for managing all heavy-lift logistics for Regionalwerke Baden and CO2 Energie AG in connection with a new biogas processing and CO2 capture plant in Niederwil, Aargau.
Learn more
Projekt SAW-3
EMIL EGGER lifts 56-tonne girders with millimeter precision
Our team was able to accompany a demanding precision lift on the Seedammcenter project in Pfäffikon SZ: A 56-tonne girder was positioned together with other concrete elements with millimetre precision. A 450-tonne pneumatic crane from EMIL EGGER was used for this work, which lifted the heavy components safely and in a controlled manner to their intended position.
Learn more
Rückbau der westlichen Wallstrassenbrücke in Ulm (1)
LR 11000 heavy-duty crane lifts up to 500 t bridge segments
As part of the comprehensive renewal of the B10 in Ulm, the Wallstrasse bridge is being completely replaced. With an investment volume of over 200 million euros, the infrastructure project is one of the largest transportation projects in the region and will take several years to complete.
Learn more
og-beste-arbeitgeber-schweiz-2026
EMIL EGGER is one of the best employers in Switzerland
In the “Best Employers in Switzerland 2026” ranking, carried out by Handelszeitung and PME in collaboration with the analysis agency Statista, over 15,000 employees are surveyed each year. The survey evaluates 1,800 companies with 200 or more employees. The focus is on trust, satisfaction, development opportunities and corporate culture.
Learn more
emil-egger-industrieumzug-energietechnik-a
Machine installation and assembly for the energy transition
EMIL EGGER carries out demanding machine installation and assembly work for the energy infrastructure. Two heat accumulators and two cold accumulators were installed and assembled safely, precisely and on schedule.
Learn more