General Terms and Conditions of EMIL EGGER AG

Transparency and legal clarity

Our General Terms and Conditions simplify cooperation, reduce risks and create a uniform and detailed regulation of legal relations. We kindly ask you to read them before concluding the contract and, in case of any ambiguities, to exchange information with the respective contact person.
Internationale Spedition Schweiz EU EMIL EGGER Logistik
Road transport

GTC for the regulation of road transports of EMIL EGGER AG in Switzerland and Liechtenstein.

GTC
Wechselpritschen Vermietung EMIL EGGER
Swap-bodies rental

General terms and conditions for the rental of swap-bodies of EMIL EGGER AG.

GTC
EMIL EGGER Hebebühnen Arbeitsbühnen Vermietung Service Logistik Schweiz
Aerial platforms rental

General terms and conditions for the rental of aerial platforms or working platforms of EMIL EGGER AG.

GTC
Brückenmontage Paserelle Transport Montage Heben Platzieren Schwergut Logistik EMIL EGGER
Crane work & industrial removals

General terms and conditions for crane work and industrial relocations of EMIL EGGER AG.

GTC
Rhätische Bahn ersetzt drei alte Stahlbrücken - EMIL EGGER übernimmt Kranarbeiten
Crawler cranes additional conditions

The additional conditions for crawler cranes apply in addition to the valid GTC for crane work and industrial removals.

GTC
Hebe- und Verschiebetechnik Litzenheber EMIL EGGER Schwergut Logistik
Heavy Lifting

General terms and conditions for lifting and shifting technology in the heavy cargo sector of EMIL EGGER AG.

GTC
Freie Lagerflächen EMIL EGGER Logistik
Warehouse management

GTC for storage of all kinds of goods, related manipulations, incoming and outgoing, as well as special services.

GTC

ALWAYS WELL INFORMED

COMPANY NEWS EMIL EGGER
emil-egger-industrieumzug-energietechnik-a
Machine installation and assembly for the energy transition
EMIL EGGER carries out demanding machine installation and assembly work for the energy infrastructure. Two heat accumulators and two cold accumulators were installed and assembled safely, precisely and on schedule.
Learn more
_Projekt_Caliqua-13
Steam turbine for Hagenholz waste incineration plant: heavy transport and single-lift installation from a single source
We were able to make a key contribution to the expansion of the Hagenholz waste incineration plant: The new steam turbine and accessories from Siemens Energy were transported from Czechia to Switzerland by EMIL EGGER and delivered to the construction site on schedule.
Learn more
ChatGPT Image 22. Dez. 2025, 11_25_06
EMIL EGGER transports 30 construction machines from Langenthal to Baar
We transported a total of 30 construction machines from Langenthal to Baar for Gebrüder Hodel AG – spread over 11 loads, all carried out with the same articulated lorry.
Learn more
emil-egger-esk-30-spezialkran-saftpresse-9-2
EGGER special crane in use for machine insertion in the tightest of spaces
When there is no room for compromise, our ESK 30 special crane comes into play! The fully electric crane masters even tricky lifting tasks in halls and production facilities with flying colors – such as lifting a 16-ton juice press for Holderhof Sulgen AG.
Learn more
emil-egger-schwergut-kranarbeiten-pneukran-abfallanlage-99
Crane work with 650-tonne pneumatic crane for sustainable waste recycling
EMIL EGGER has developed for the operator GEVAG – SMARTE ENERGIE. FROM WASTE. – large plant components, including a filter housing with hoppers and steel fixtures. Our 650-tonne mobile crane with 38.5 m luffing jib was used.
Learn more
ohne-Rahmen-1-1
EMIL EGGER lifts 190 t underpass in Rheinfelden
The old SBB underpass “Büchliweg” was lifted with a stacking system (jack-up system) and moved out directly on self-propelled modular transporters (SPMT) and deposited in an interim storage area.
Learn more
emil-egger-lehrlinge-2025-1-ret3
Apprentice training at EMIL EGGER
On August 4, we welcomed 11 new apprentices to our Härkingen and St. Gallen locations.
Learn more
default
From transportation to installation – EGGER supports the bridge project in all phases
In the night of 04. The third and final major crane lift as part of the bridge replacement project in Münchenstein was successfully completed on August 5, 2025: The new underwater bridge weighing 255 tons was precisely lifted into place with a 1000-ton crawler crane at a radius of 53 meters.
Learn more
emil-egger-ltm-1650-modell-1
Giant in miniature format – exclusively in EMIL EGGER design
Get the epitome of technical model making: The mobile crane from WSI in the EMIL EGGER fleet design on a scale of 1:50 impresses with its massive appearance, finest details and true-to-original mobility.
Learn more
emil-egger-kranarbeiten-spezialtransport-windkraft-andermatt-47
Special transportation of wind turbines from Basel to Andermatt
Four new ENERCON wind turbines commissioned by EW Ursern and Energie Uri (EWA) for Andermatt are really getting things moving in the canton of Uri – and our team from EMIL EGGER was right in the middle of it all.
Learn more