Compliance at the EMIL EGGER Group

Responsibility that connects. Integrity that moves.

The success and good reputation of EMIL EGGER AG are based on the trust that our employees, customers, suppliers, partners, authorities, and the public place in us every day. This trust is the foundation of our actions—and our most important asset. We are aware of this responsibility and do everything in our power to live up to this standard at all times.

Downloads:

Compliance services:

Compliance Report

Anonymous or with contact details

ALWAYS WELL INFORMED

COMPANY NEWS EMIL EGGER
Rückbau der westlichen Wallstrassenbrücke in Ulm (1)
LR 11000 heavy-duty crane lifts up to 500 t bridge segments
As part of the comprehensive renewal of the B10 in Ulm, the Wallstrasse bridge is being completely replaced. With an investment volume of over 200 million euros, the infrastructure project is one of the largest transportation projects in the region and will take several years to complete.
Learn more
og-beste-arbeitgeber-schweiz-2026
EMIL EGGER is one of the best employers in Switzerland
In the “Best Employers in Switzerland 2026” ranking, carried out by Handelszeitung and PME in collaboration with the analysis agency Statista, over 15,000 employees are surveyed each year. The survey evaluates 1,800 companies with 200 or more employees. The focus is on trust, satisfaction, development opportunities and corporate culture.
Learn more
emil-egger-industrieumzug-energietechnik-a
Machine installation and assembly for the energy transition
EMIL EGGER carries out demanding machine installation and assembly work for the energy infrastructure. Two heat accumulators and two cold accumulators were installed and assembled safely, precisely and on schedule.
Learn more
_Projekt_Caliqua-13
Steam turbine for Hagenholz waste incineration plant: heavy transport and single-lift installation from a single source
We were able to make a key contribution to the expansion of the Hagenholz waste incineration plant: The new steam turbine and accessories from Siemens Energy were transported from Czechia to Switzerland by EMIL EGGER and delivered to the construction site on schedule.
Learn more
ChatGPT Image 22. Dez. 2025, 11_25_06
EMIL EGGER transports 30 construction machines from Langenthal to Baar
We transported a total of 30 construction machines from Langenthal to Baar for Gebrüder Hodel AG – spread over 11 loads, all carried out with the same articulated lorry.
Learn more
emil-egger-esk-30-spezialkran-saftpresse-9-2
EGGER special crane in use for machine insertion in the tightest of spaces
When there is no room for compromise, our ESK 30 special crane comes into play! The fully electric crane masters even tricky lifting tasks in halls and production facilities with flying colors – such as lifting a 16-ton juice press for Holderhof Sulgen AG.
Learn more
emil-egger-schwergut-kranarbeiten-pneukran-abfallanlage-99
Crane work with 650-tonne pneumatic crane for sustainable waste recycling
EMIL EGGER has developed for the operator GEVAG – SMARTE ENERGIE. FROM WASTE. – large plant components, including a filter housing with hoppers and steel fixtures. Our 650-tonne mobile crane with 38.5 m luffing jib was used.
Learn more
ohne-Rahmen-1-1
EMIL EGGER lifts 190 t underpass in Rheinfelden
The old SBB underpass “Büchliweg” was lifted with a stacking system (jack-up system) and moved out directly on self-propelled modular transporters (SPMT) and deposited in an interim storage area.
Learn more
emil-egger-lehrlinge-2025-1-ret3
Apprentice training at EMIL EGGER
On August 4, we welcomed 11 new apprentices to our Härkingen and St. Gallen locations.
Learn more
default
From transportation to installation – EGGER supports the bridge project in all phases
In the night of 04. The third and final major crane lift as part of the bridge replacement project in Münchenstein was successfully completed on August 5, 2025: The new underwater bridge weighing 255 tons was precisely lifted into place with a 1000-ton crawler crane at a radius of 53 meters.
Learn more