before 12 months | EMIL EGGER AG

EGGER special crane for confined spaces

Removal of clarifier screen for the Thalwil WWTP

For the waste water purification plant in Thalwil, our team moved a 3.5 t clarifier screen with a radius of 18 m with millimeter precision - using our ESK 30 special crane.
emil-egger-esk-30-spezialkran-ara-thalwil-2

The compact, fully electric crane scores with:

  • Hydraulically luffing jib head
  • Load capacity up to 24 t over short distances
  • Jib up to 29 m (with jib – additional jib arm)
  • Large tires (for driving on gravel)
  • Possibility to move suspended loads of up to 20 t
  • Ultra-slim design – fits through (almost) any door
  • Flexible support & 360 degree steering for confined spaces

Ideal for confined construction sites – perfect for this order from ARA Thalwil.

More news from Emil Egger

emil-egger-spezialtransport-säntis-schwebebahn-1
Construction of the new Säntis cable car
The first cables for the new Säntisbahn have arrived at Schwägalp – and we were able to play a part in this special transport operation.
Learn more
emil-egger-transport-flugzeug-cellsius-4
EMIL EGGER transports the H2-Sling hydrogen-powered aircraft
For the Swiss innovation project CELLSIUS Aero, EMIL EGGER was entrusted with an extraordinary transport mission: The H2-Sling, a hydrogen-powered experimental aircraft, was transported from Dübendorf to Payerne.
Learn more
26-05-12-3214
Precise crane operation in winter conditions
As part of the construction of the new Säntis suspension railroad, EMIL EGGER was once again able to make a contribution to an important infrastructure project in Eastern Switzerland. Together with the fitters from Garaventa, the existing cabins of the Säntis suspension railroad were safely lifted down into the valley.
Learn more
emil-egger-reussbruecke-kranhub-thb-spezialtransporte-1
Precision in time with rail traffic
On the first weekend in May, EMIL EGGER successfully completed another important construction phase on the Reuss Bridge in Lucerne. The listed railroad bridge – over which around 200 trains pass every day – is currently being extensively renovated. The last major renovation was carried out in 1987.
Learn more
emil-egger-seftausteg-bern-4
Efficient lifting technology from EMIL EGGER for bridge renovation in Bern
The Seftau footbridge in Felsenau near Bern was successfully excavated on April 28, 2026. The 53-metre-long foot and cycle bridge connects the municipalities of Bern and Bremgarten bei Bern and is currently undergoing extensive renovation.
Learn more
emil-egger-rueckbau-wallstrassenbruecke-ulm-lr11000-22
When logistics moves mountains: EMIL EGGER brings a 1,000-tonne crane to the construction site
Before a large crawler crane even makes its first lift, an impressive logistical feat has already taken place. A crane such as the Liebherr LR 11000 is completely dismantled for transport and delivered to the construction site in numerous individual parts.
Learn more
emil-egger-rueckbau-wallstrassenbruecke-ulm-lr11000-2
Demolition of the Wallstrasse Bridge in Ulm – Video footage of the operation
A few days ago, we reported on our involvement in the demolition of the Wallstrasse Bridge in Ulm. Now, video footage provides further insights into this extraordinary project and impressively demonstrates the scale and precision of the work carried out.
Learn more
default
Heavy-lift logistics for energy infrastructure – project in Niederwil, Aargau
Since the start of the year, we have been responsible for managing all heavy-lift logistics for Regionalwerke Baden and CO2 Energie AG in connection with a new biogas processing and CO2 capture plant in Niederwil, Aargau.
Learn more
Projekt SAW-3
EMIL EGGER lifts 56-tonne girders with millimeter precision
Our team was able to accompany a demanding precision lift on the Seedammcenter project in Pfäffikon SZ: A 56-tonne girder was positioned together with other concrete elements with millimetre precision. A 450-tonne pneumatic crane from EMIL EGGER was used for this work, which lifted the heavy components safely and in a controlled manner to their intended position.
Learn more
Rückbau der westlichen Wallstrassenbrücke in Ulm (1)
LR 11000 heavy-duty crane lifts up to 500 t bridge segments
As part of the comprehensive renewal of the B10 in Ulm, the Wallstrasse bridge is being completely replaced. With an investment volume of over 200 million euros, the infrastructure project is one of the largest transportation projects in the region and will take several years to complete.
Learn more