Planning & Engineering

From concept to execution

In cooperation with us, you can expect concentrated, well-founded know-how in crane, assembly and transport issues. Industry-specific, personal and absolutely confidential. Through our involvement and the holistic, economic way of thinking for your project, we reduce interfaces. In this way, we increase quality and efficiency with the goal of shorter construction times as well as faster commissioning and higher schedule reliability. Benefit from our broad range of experience right from the concept phase.

YOUR STRONG PARTNER FOR HEAVY CARGO LOGISTICS

EMIL EGGER makes heavy cargo logistics easy for customers. We work according to a full-service concept. This means that we offer our customers all services from a single source, from consulting, through planning/engineering, to the actual execution and realization. Personal contact partners take responsibility for the challenges of our customers. Therefore EMIL EGGER is considered THE reliable heavy cargo professional.

 

PLANNING / ENGINEERING

  • Customer-oriented solution approaches
  • Individual concepts under consideration of the economic efficiency in the overall project
  • Feasibility studies from preliminary project
  • Driveability simulations & route tests for heavy and special transports
  • Basis for various decisions
  • CAD simulation of operations and preparation of 2D and 3D drawings
  • Many years of specific industry experience
  • Innovative and unique additional equipment

 

EXECUTION / REALIZATION

  • Smooth processes thanks to specialized teams in close cooperation with the client
  • Interface reduction for the customer thanks to extensive portfolio
  • Over 60 vehicle combinations for heavy and special transports
  • Over 50 mobile and crawler cranes up to 1000 t and over 30 loader cranes
  • Transport escort and permit service
  • Storage and handling in all dimensions
  • Moving and assembly teams
  • Lifting and sliding technology up to several thousand tons
  • Aerial platform and forklift rentals
emil-egger-ag-michael-dudler-geschaeftsleitung-bereichsleiter-schwergut

SUCCESSFUL TOGETHER

“Involve us in the early planning phase and benefit from our experience and know-how in heavy cargo logistics. Together, we lead every project to success.”

Michael Dudler
Division Manager Heavy Cargo Logistics, Member of the Executive Board

We minimize risks with conscientious and forward-looking planning that incorporates our entire know-how. Our focus is also always on our project partners when it comes to shortening interruption times. We solve the effort to accelerate the commissioning by effective work processes and if necessary also by night work.

When it comes to competent heavy-lift logistics, customers from all industries rely on our specific know-how. In particular, civil engineering (bridges & deconstruction, underpasses), construction crane assembly, module and prefabricated part construction, plant construction (MSWI, CHP plants & industrial plants as well as wind energy plants are part of our daily business and make us to the Swiss market leader in heavy cargo logistics.

Millimeter-precise positioning of concrete elements weighing up to 90 tons with the 1000-ton crawler crane

DAM ON THE GRIMSEL – ASSEMBLY OF LUFFING JIB CRANES

Montage d’un pont sur le lac de Neuchâtel

Chantier Olma – St-Gall

OVERVIEW ETE VEHICLE FLEET

TECHNICAL MANUAL

To quickly evaluate the appropriate devices, the technical manual is available as a PDF. On more than 300 pages you will find our heavy lift product range at a glance including technical drawings & dimension tables. Our project managers look forward to provide you with further information.

The entire vehicle fleet in the practical e-paper
emil-egger-technisches-handbuch-kran-hebebuehne-logistik-schwergut-pneukran-mobilkran-lkw-kran-
HEAVY CARGO EMPLOYEES
216
MOBILE CRANES
37
CRAWLER CRANES
10

THE NUMBER 1 IN HEAVY CARGO LOGISTICS IN SWITZERLAND

YOUR PARTNER FOR WEIGHTY PROJECTS
Baar, entrance Aegeristrassse
Transport of the motorboat Schwyz from Lake Zug to Lake Walen
The MS Schwyz changes the lake. The ship with a length of 31.2 m, a width of 7 m and a height of 4.4 m was lifted out of Lake Zug on Monday morning by two pneu cranes of the EMIL EGGER Group and loaded onto an articulated lorry. It will change lakes and be transported to Lake Walen under challenging conditions and, if everything goes according to plan, will finally be put into the water on Thursday.
Learn more
liebherr-lr1700-1-0-egger-300dpi
EMIL EGGER relies on Liebherr crawler cranes for the construction of an impressive wind farm
The EMIL EGGER Group is one of the top 20 crane service providers in the German-speaking region. In an eight-week deployment, we made an impressive contribution to renewable energy in Switzerland by installing six wind turbines in the Swiss Jura. The impressive turbines, manufactured by Enercon, are expected to produce 22 million kilowatt hours of electricity annually. Key to the successful erection of these wind turbines were modern Liebherr crawler cranes, which lifted loads of over 70 tons to an astonishing height of 100 meters.
Learn more
emil-egger-1000-tonnen-lr-11000-raupenkran-unterfuehrung-einhub-8
SBB Pfungen station
Last weekend, the ETE employees performed an extraordinary feat. The starting signal for the operation was given on Friday morning at 4:00 am. At Pfungen railway station, we were able to move a pre-concreted pedestrian subway including the associated stair and ramp elements up to 170 t with our 1000 t Liebherr LR 11000 crawler crane.
Learn more
emil-egger-spezialtransporte-kranarbeiten-platzierung-unterfuehrung-schwergut-logistik-6
190 TONS OF RAILWAY SUBWAY PLACED
The LR 11000 was erected for the placement of a 190-tonne passenger subway at Martigny railway station in the Valais. The parts of the giant crane were delivered with 25 tugs and assembled with a mobile crane.
Learn more
emil-egger-spezialtransporte-tiefbettauflieger-modul-bau-kranmontage-3
284 MODULES TRANSPORTED AND PLACED BY CRANE
On behalf of Burckhardt Compression AG, Winterthur, we were allowed to lift a 280 t compressor from the production site in Winterthur with our 500 t lifting system, move it and then load it onto our 18-axle special low-loader. With a total weight of more than 420 t and a total length of almost 60 m, including the two impact vehicles, we then drove along cantonal roads in the direction of Auhafen/Basel.
Learn more
emil-egger-spezialtransport-maschinentransport-kompressor-industrieumzug-logistik-2s
Industrial relocation with special transport
On behalf of Burckhardt Compression AG, Winterthur, we were allowed to lift a 280 t compressor from the production site in Winterthur with our 500 t lifting system, move it and then load it onto our 18-axle special low-loader. With a total weight of more than 420 t and a total length of almost 60 m, including the two impact vehicles, we then drove along cantonal roads in the direction of Auhafen/Basel.
Learn more
emil-egger-bergung-zugunglueck-bahnwagen-schweiz-bern
Recovery after train accident
At the end of March, a violent storm blew a three-car train composition off the tracks in Lüscherz, Bern. Of the 16 passengers on the train at the time, three were injured. Fortunately, there were no serious injuries. EMIL EGGER AG was entrusted with the rescue.
Learn more
default
Relocation of HPHT presses for Algordanza
Algordanza AG is the only manufacturer of memorial diamonds worldwide. From the urn ashes of the deceased, a diamond is created that can always be carried with you and is everlasting. The isolation of the carbon, by means of a chemical process is carried out in the Swiss laboratory by experienced laboratory technicians. To enable crystal synthesis, conditions must be created as in the earth’s interior. Diamonds are formed by pressure and high temperatures. This is simulated by HPHT (High Pressure – High Temperature) presses and allows the memory diamonds to be created.
Learn more
emil-egger-ag-auf-innoteq-bern-3
MEETING PLACE FOR THE SWISS MANUFACTURING INDUSTRY
From 7 to 10 March, Bern will be the venue for the Swiss machinery and manufacturing industry. This is also an important moment for EMIL EGGER AG. We can be found with our special electric crane ESK 30 in Hall 2.0 on Stand F01. Our industrial relocation professionals are looking forward to numerous visits.
Learn more
emil-egger-crane-work-moving-railway-bridge
Replacement beaver bridge in Biberbrugg with 1000 tons crane
Numerous onlookers followed the work of replacing the 60-year-old beaver bridge in Biberbrugg from September 30 to October 2. Toneatti AG, together with subcontractors such as EMIL EGGER, carried out the long-planned work. After dismantling the old bridge, the new one, 17 m long and weighing 240 tons, was then set with millimeter precision.
Learn more