Rent forklift up to 16 tons lifting capacity

Lift and move safely

EMIL EGGER offers a wide range of forklifts for indoor and outdoor applications in the field of warehousing and removals. From 1.4 tons to 7 tons lifting capacity, forklifts can be rented from us in external operation. From 7 tons to 16 tons lifting capacity, we offer rental only including operation of the equipment.
Beat Wyss Hebebühnen Vermietung EMIL EGGER

Increased efficiency with more power

“With our heavy-duty forklifts, you can lift goods weighing up to 16 tons easily and efficiently. For example, moving a machine in a hall or loading or unloading for transport: use our fleet of forklifts including operation and service such as delivery as well as collection.”

Beat Wyss
Project Manager lifting platforms, rental forklifts

SIMPLY RENT THE RIGHT WORK EQUIPMENT – WITH OR WITHOUT OPERATION

Heavy-duty forklifts can be used to load or move heavy machinery. Usually, lifting heights of up to six meters are possible. ETE also has telescopic forklifts that can reach lifting heights of up to 13 metres. Together with you, we will find the right machine from our fleet for every application.

Technical manual

Overview stacker in e-paper

In order to be able to quickly evaluate the suitable vehicles or equipment, the technical manual is available with a practical overview index. Digitally also available as an interactive PDF. On more than 300 pages you will find all vehicles of our heavy lift logistics fleet at a glance – including technical drawings & dimension tables. Our project managers will be happy to provide you with further information.

The entire vehicle fleet in the practical e-paper
emil-egger-technisches-handbuch-kran-hebebuehne-logistik-schwergut-pneukran-mobilkran-lkw-kran-

EMIL EGGER has warehouses for general cargo and heavy lift throughout Switzerland.

THE NUMBER 1 IN HEAVY LIFT LOGISTICS IN SWITZERLAND

YOUR SPECIALIST FOR WEIGHTY PROJECTS
1emil-egger-elektro-baustelle-lkw-bagger-6
EMIL EGGER on the road electrically
With the “e-construction site” project, the city of Zurich is pursuing the goal of testing the use of electrically powered construction site vehicles in order to reduce greenhouse gas and noise emissions and improve air quality.
Learn more
default
Successful reinstallation of the Sitter Bridge in Appenzell
EMIL EGGER at work on a challenging infrastructure project for Appenzeller Bahnen.
Learn more
default
185 tons of Reuss bridge on the hook
On the weekend of 22/23 March 2025, a significant milestone was reached in the renovation of the Reussbrücke Fluhmühle bridge in Lucerne: the first of three bridge sections was successfully lifted out – an impressive 185 tons of steel were suspended from the 1000 t crawler crane with an 84 m jib!
Learn more
emil-egger-industrieumzug-schwergut-logistik-maschine
Precision and teamwork for machine relocation in Künten
For the packaging and molded parts manufacturer Taracell AG in Künten, we mastered a challenging heavy goods logistics task.
Learn more
1emil-egger-rueckbau-bruecke-hanau-raupenkran-2025-19
Dismantling of the B43 bridge over the DB facilities in Hanau
Work began on December 2, 2024 and is scheduled to be completed by March 2025. The first construction phase had its intensive phase in the last week of December. The second intensive phase will now follow over the next few weeks.
Learn more
emil-egger-muttenz-überfuehrung-kranarbeiten-2
Successful dismantling weekend in Muttenz
Last weekend we were able to complete the crane work for the dismantling of the Grenzacherstrasse overpass in Muttenz.
Learn more
emil-egger-tunnelbohrmaschine-gotthardtunnel-spezialtransport 5
Special transportation of large and heavy parts of a tunnel boring machine
Last week, EMIL EGGER AG delivered two of the largest and heaviest parts of the tunnel boring machine for the second tube of the Gotthard tunnel.
Learn more
default
Work of art installed in Zurich Werdhölzli
The artwork “Schräg im Gleichgewicht” was created in 1984. It was dismantled in 2014 for the renovation of the entrance area and temporarily stored at Werdhölzli.
Learn more
default
Crane hand in action with the special crane from EMIL EGGER
We had the exciting task of moving the façade supports with our special ESK 30 crane and the attached crane hand with millimeter precision on a nearly completed building.
Learn more
emil-egger-muttenz-freulerbruecke-5
Dismantling of Freuler Bridge Muttenz
In the night from 8 to July 9, the first stage of the crane work for the dismantling of the Freuler Bridge came to an end in Muttenz.
Learn more