Relocation of HPHT presses for Algordanza

Industrial relocation & machinery transport by EMIL EGGER

Algordanza AG is the only manufacturer of memorial diamonds worldwide. From the urn ashes of the deceased, a diamond is created that can always be carried with you and is everlasting. The isolation of the carbon, by means of a chemical process is carried out in the Swiss laboratory by experienced laboratory technicians. To enable crystal synthesis, conditions must be created as in the earth's interior. Diamonds are formed by pressure and high temperatures. This is simulated by HPHT (High Pressure - High Temperature) presses and allows the memory diamonds to be created.
default

In total, 12 lower plunger presses for the production of commemorative diamonds were transported by EMIL EGGER from the old to the new location. At each location we were on site with a pneumatic crane or mobile crane and a team. Thus we were able to transport up to 6 presses per day. We thank you for your confidence in our industrial relocation team and the order!

YouTube

By loading the video, you agree to YouTube's privacy policy.
Learn more

Load video

Professional Crane logistics

EMIL EGGER ranks in the top 20 of German-speaking crane service providers

Fast, flexible and professional – that’s our motto. We can be reached 24 hours on the hotline +41 71 282 52 20 and are available in all regions of Switzerland. Thanks to our powerful crane and special transport sector, we are always ready for action. EMIL EGGER is also the only Swiss company to rank among the top 20 German-speaking crane service providers. Our diverse fleet includes mobile cranes, crawler cranes, mobile construction cranes, special cranes, truck cranes and mini cranes.

Crane logistics

More news from Emil Egger

emil-egger-reussbruecke-kranhub-thb-spezialtransporte-1
Precision in time with rail traffic
On the first weekend in May, EMIL EGGER successfully completed another important construction phase on the Reuss Bridge in Lucerne. The listed railroad bridge – over which around 200 trains pass every day – is currently being extensively renovated. The last major renovation was carried out in 1987.
Learn more
emil-egger-seftausteg-bern-4
Efficient lifting technology from EMIL EGGER for bridge renovation in Bern
The Seftau footbridge in Felsenau near Bern was successfully excavated on April 28, 2026. The 53-metre-long foot and cycle bridge connects the municipalities of Bern and Bremgarten bei Bern and is currently undergoing extensive renovation.
Learn more
emil-egger-rueckbau-wallstrassenbruecke-ulm-lr11000-22
When logistics moves mountains: EMIL EGGER brings a 1,000-tonne crane to the construction site
Before a large crawler crane even makes its first lift, an impressive logistical feat has already taken place. A crane such as the Liebherr LR 11000 is completely dismantled for transport and delivered to the construction site in numerous individual parts.
Learn more
emil-egger-rueckbau-wallstrassenbruecke-ulm-lr11000-2
Demolition of the Wallstrasse Bridge in Ulm – Video footage of the operation
A few days ago, we reported on our involvement in the demolition of the Wallstrasse Bridge in Ulm. Now, video footage provides further insights into this extraordinary project and impressively demonstrates the scale and precision of the work carried out.
Learn more
default
Heavy-lift logistics for energy infrastructure – project in Niederwil, Aargau
Since the start of the year, we have been responsible for managing all heavy-lift logistics for Regionalwerke Baden and CO2 Energie AG in connection with a new biogas processing and CO2 capture plant in Niederwil, Aargau.
Learn more
Projekt SAW-3
EMIL EGGER lifts 56-tonne girders with millimeter precision
Our team was able to accompany a demanding precision lift on the Seedammcenter project in Pfäffikon SZ: A 56-tonne girder was positioned together with other concrete elements with millimetre precision. A 450-tonne pneumatic crane from EMIL EGGER was used for this work, which lifted the heavy components safely and in a controlled manner to their intended position.
Learn more
Rückbau der westlichen Wallstrassenbrücke in Ulm (1)
LR 11000 heavy-duty crane lifts up to 500 t bridge segments
As part of the comprehensive renewal of the B10 in Ulm, the Wallstrasse bridge is being completely replaced. With an investment volume of over 200 million euros, the infrastructure project is one of the largest transportation projects in the region and will take several years to complete.
Learn more
emil-egger-industrieumzug-energietechnik-a
Machine installation and assembly for the energy transition
EMIL EGGER carries out demanding machine installation and assembly work for the energy infrastructure. Two heat accumulators and two cold accumulators were installed and assembled safely, precisely and on schedule.
Learn more
_Projekt_Caliqua-13
Steam turbine for Hagenholz waste incineration plant: heavy transport and single-lift installation from a single source
We were able to make a key contribution to the expansion of the Hagenholz waste incineration plant: The new steam turbine and accessories from Siemens Energy were transported from Czechia to Switzerland by EMIL EGGER and delivered to the construction site on schedule.
Learn more
ChatGPT Image 22. Dez. 2025, 11_25_06
EMIL EGGER transports 30 construction machines from Langenthal to Baar
We transported a total of 30 construction machines from Langenthal to Baar for Gebrüder Hodel AG – spread over 11 loads, all carried out with the same articulated lorry.
Learn more