Mission #3 from this weekend also worked out perfectly. Super teamwork between SBB, the engineers, the Frutiger construction company and many specialists. The 495-ton underpass was moved to 22m projection with millimeter precision.
ETE – the infrastructure professionals.
We thank everyone involved and look forward to the next challenges. This makes heavy-lift logistics XXL fun.