before 6 years | EMIL EGGER AG

EMIL EGGER – the professionals for heavy cargo logistics

Heavy-cargo transport during dismantling of Mühleberg nuclear power plant

The transports with a length of 44m / height of 4.8m / width of 3.9m and a total weight of 242 tons were also something unusual for the team of EMIL EGGER.
Emil Egger Heavy Lift Logistics Mühleberg Nuclear Power Plant
Emil Egger heavy lift transport of stators of the nuclear power plant Mühleberg

During two nights we were allowed to transport two stators from Mühleberg to Kaiseraugst. Guided by our own exceptional transport escort (ATB), the steel colossi were safely transported to their destination on the 14 axle line transporter with buffer vehicle.

Are you also looking for the perfect solution for heavy cargo transport and want everything from a single source? Then you have come to the right place.

Professional Crane logistics

EMIL EGGER ranks in the top 20 of German-speaking crane service providers

Fast, flexible and professional – that’s our motto. We can be reached 24 hours on the hotline +41 71 282 52 20 and are available in all regions of Switzerland. Thanks to our powerful crane and special transport sector, we are always ready for action. EMIL EGGER is also the only Swiss company to rank among the top 20 German-speaking crane service providers. Our diverse fleet includes mobile cranes, crawler cranes, mobile construction cranes, special cranes, truck cranes and mini cranes.

Crane logistics

More news from Emil Egger

Bild 1
750-metric-ton crawler crane for the new SBB Aare Bridge in Solothurn
With cantilevers extending up to 108 meters, EMIL EGGER supported the assembly of the new steel structure for the SBB Aare Bridge in Solothurn. A total of eleven bridge elements, weighing up to 71 metric tons each, were hoisted into place.
Learn more
714026805_Biel_Heidenweg_Brücke_Einhebung_150dpi_0790_D
Tandem lift using a 650-tonne and a 450-tonne mobile crane
Following the successful dismantling in June, the next milestone in the refurbishment of the Heideweg Bridge in Biel was reached in September: the new central section of the bridge was hoisted into place over Bernstrasse at the Brüggmoos junction.
Learn more
emil-egger-bahnbrücke-wetzikon-sbb-b
LR 11000 lifts new railway bridge into place in Wetzikon
The EMIL EGGER Group’s most powerful crawler crane was deployed during the replacement of the railway bridge over Usterstrasse in Wetzikon. After lifting two abutments, each weighing 210 tonnes, the new steel bridge, weighing 160 tonnes, was precisely positioned at its intended location.
Learn more
default
1,200-tonne railway underpass in Niederbipp postponed
As part of the refurbishment of the Scharnageln–Niederbipp section of the Aare Seeland mobil AG railway line, EMIL EGGER was able to support a challenging project involving heavy-lift logistics, lifting and relocation technology.
Learn more
emil-egger-spezialtransport-säntis-schwebebahn-1
Construction of the new Säntis cable car
The first cables for the new Säntisbahn have arrived at Schwägalp – and we were able to play a part in this special transport operation.
Learn more
Bild 1v5
Demolition work using the 450-metric-tonne mobile crane in Biel
During the night of 16 to 17 June 2026, EMIL EGGER was involved in the dismantling of the Heideweg Bridge in Biel. As part of the ongoing renovation work, the central section of the bridge over Bernstrasse at the Brüggmoos junction was dismantled.
Learn more
emil-egger-transport-flugzeug-cellsius-4
EMIL EGGER transports the H2-Sling hydrogen-powered aircraft
For the Swiss innovation project CELLSIUS Aero, EMIL EGGER was entrusted with an extraordinary transport mission: The H2-Sling, a hydrogen-powered experimental aircraft, was transported from Dübendorf to Payerne.
Learn more
26-05-12-3214
Precise crane operation in winter conditions
As part of the construction of the new Säntis suspension railroad, EMIL EGGER was once again able to make a contribution to an important infrastructure project in Eastern Switzerland. Together with the fitters from Garaventa, the existing cabins of the Säntis suspension railroad were safely lifted down into the valley.
Learn more
emil-egger-reussbruecke-kranhub-thb-spezialtransporte-1
Precision in time with rail traffic
On the first weekend in May, EMIL EGGER successfully completed another important construction phase on the Reuss Bridge in Lucerne. The listed railroad bridge – over which around 200 trains pass every day – is currently being extensively renovated. The last major renovation was carried out in 1987.
Learn more
emil-egger-seftausteg-bern-4
Efficient lifting technology from EMIL EGGER for bridge renovation in Bern
The Seftau footbridge in Felsenau near Bern was successfully excavated on April 28, 2026. The 53-metre-long foot and cycle bridge connects the municipalities of Bern and Bremgarten bei Bern and is currently undergoing extensive renovation.
Learn more