EGGER special crane in use for machine insertion in the tightest of spaces

Juice press installed at Holderhof AG

When there is no room for compromise, our ESK 30 special crane comes into play! The fully electric crane masters even tricky lifting tasks in halls and production facilities with flying colors - such as lifting a 16-ton juice press for Holderhof Sulgen AG.
emil-egger-esk-30-spezialkran-saftpresse-9-2

With its hydraulically luffing jib head, flexible support and compact dimensions, the ESK 30 lifts loads of up to 23.8 t to 4.6 m – emission-free, precise and powerful.
Perfect for assembly work, machine installations or projects with minimal clearance.

  • Location: Sulgen TG
  • Challenge: Lifting in a narrow production hall
  • Solution: ESK 30 – electric, compact & powerful

Thanks to the smooth cooperation with Sepp Oberholzer AG, the system was installed on schedule.

With special cranes such as the ESK 30, EMIL EGGER offers the right solution for demanding assembly work – wherever millimeter work is required.

More news from Emil Egger

emil-egger-industrieumzug-energietechnik-a
Machine installation and assembly for the energy transition
EMIL EGGER carries out demanding machine installation and assembly work for the energy infrastructure. Two heat accumulators and two cold accumulators were installed and assembled safely, precisely and on schedule.
Learn more
_Projekt_Caliqua-13
Steam turbine for Hagenholz waste incineration plant: heavy transport and single-lift installation from a single source
We were able to make a key contribution to the expansion of the Hagenholz waste incineration plant: The new steam turbine and accessories from Siemens Energy were transported from Czechia to Switzerland by EMIL EGGER and delivered to the construction site on schedule.
Learn more
emil-egger-schwergut-kranarbeiten-pneukran-abfallanlage-99
Crane work with 650-tonne pneumatic crane for sustainable waste recycling
EMIL EGGER has developed for the operator GEVAG – SMARTE ENERGIE. FROM WASTE. – large plant components, including a filter housing with hoppers and steel fixtures. Our 650-tonne mobile crane with 38.5 m luffing jib was used.
Learn more
ohne-Rahmen-1-1
EMIL EGGER lifts 190 t underpass in Rheinfelden
The old SBB underpass “Büchliweg” was lifted with a stacking system (jack-up system) and moved out directly on self-propelled modular transporters (SPMT) and deposited in an interim storage area.
Learn more