before 4 years | EMIL EGGER AG

When the smallest is suddenly the highest

EMIL EGGER Miniraupenran C6 at over 2500 meters above sea level

In the spring of 2022, our smallest C6 mini crawler crane had a big job on the landmark of eastern Switzerland - the Säntis - at an altitude of over 2500 metres. Various crane jobs had to be carried out as part of a research project.
EMIL EGGER Mini caterpillar crane C6 on the Säntis
EMIL EGGER Mini caterpillar crane C6 on the Säntis

Professional Crane logistics

EMIL EGGER ranks in the top 20 of German-speaking crane service providers

Fast, flexible and professional – that’s our motto. We can be reached 24 hours on the hotline +41 71 282 52 20 and are available in all regions of Switzerland. Thanks to our powerful crane and special transport sector, we are always ready for action. EMIL EGGER is also the only Swiss company to rank among the top 20 German-speaking crane service providers. Our diverse fleet includes mobile cranes, crawler cranes, mobile construction cranes, special cranes, truck cranes and mini cranes.

Crane logistics

More news from Emil Egger

emil-egger-industrieumzug-energietechnik-a
Machine installation and assembly for the energy transition
EMIL EGGER carries out demanding machine installation and assembly work for the energy infrastructure. Two heat accumulators and two cold accumulators were installed and assembled safely, precisely and on schedule.
Learn more
_Projekt_Caliqua-13
Steam turbine for Hagenholz waste incineration plant: heavy transport and single-lift installation from a single source
We were able to make a key contribution to the expansion of the Hagenholz waste incineration plant: The new steam turbine and accessories from Siemens Energy were transported from Czechia to Switzerland by EMIL EGGER and delivered to the construction site on schedule.
Learn more
ChatGPT Image 22. Dez. 2025, 11_25_06
EMIL EGGER transports 30 construction machines from Langenthal to Baar
We transported a total of 30 construction machines from Langenthal to Baar for Gebrüder Hodel AG – spread over 11 loads, all carried out with the same articulated lorry.
Learn more
emil-egger-esk-30-spezialkran-saftpresse-9-2
EGGER special crane in use for machine insertion in the tightest of spaces
When there is no room for compromise, our ESK 30 special crane comes into play! The fully electric crane masters even tricky lifting tasks in halls and production facilities with flying colors – such as lifting a 16-ton juice press for Holderhof Sulgen AG.
Learn more
emil-egger-schwergut-kranarbeiten-pneukran-abfallanlage-99
Crane work with 650-tonne pneumatic crane for sustainable waste recycling
EMIL EGGER has developed for the operator GEVAG – SMARTE ENERGIE. FROM WASTE. – large plant components, including a filter housing with hoppers and steel fixtures. Our 650-tonne mobile crane with 38.5 m luffing jib was used.
Learn more
default
From transportation to installation – EGGER supports the bridge project in all phases
In the night of 04. The third and final major crane lift as part of the bridge replacement project in Münchenstein was successfully completed on August 5, 2025: The new underwater bridge weighing 255 tons was precisely lifted into place with a 1000-ton crawler crane at a radius of 53 meters.
Learn more
emil-egger-kranarbeiten-spezialtransport-windkraft-andermatt-47
Special transportation of wind turbines from Basel to Andermatt
Four new ENERCON wind turbines commissioned by EW Ursern and Energie Uri (EWA) for Andermatt are really getting things moving in the canton of Uri – and our team from EMIL EGGER was right in the middle of it all.
Learn more
default
Special transportation of wind turbines from Basel to Andermatt
Four new ENERCON wind turbines commissioned by EW Ursern and Energie Uri (EWA) for Andermatt are really getting things moving in the canton of Uri – and our team from EMIL EGGER was right in the middle of it all.
Learn more
emil-egger-esk-30-spezialkran-ara-thalwil-2
EGGER special crane for confined spaces
For the waste water purification plant in Thalwil, our team moved a 3.5 t clarifier screen with a radius of 18 m with millimeter precision – using our ESK 30 special crane.
Learn more
emil-egger-maschine-industrieumzug-polycontact-5
Mikron milling center safely relocated by industrial relocation team
We successfully installed a new Mikron UCP 600 Vario milling center in the basement of the company building of Polycontact AG in Chur.