before 2 years | EMIL EGGER AG

New logistics center in Härkingen

Expanded capacities for the storage of heavy goods and general cargo

The EMIL EGGER Group's new logistics center in Härkingen is now complete. With a length of 120 metres and a width of 62 metres, the building has impressive dimensions and offers us and our customers particular flexibility and new possibilities.
default

The logistics center comprises:

  • A basement with parking spaces for 180 cars and a corresponding number of e-charging stations.
  • A ground floor with a 3,100 m² heavy goods warehouse, equipped with one 32-tonne and three 16-tonne indoor cranes, which facilitate the storage and retrieval of large and heavy goods.
  • A goods handling area covering 4,100 m² with a total of 10 loading ramps and five 10-tonne overhead cranes.
  • Three floors with a combination of office and warehouse space, totalling over 10,000 m² of storage space.
  • In addition, we have installed a photovoltaic system on the large roof area, which covers part of our electricity requirements. Our ETE warehouse team has now moved into the 2nd floor as a new workplace, where training rooms, recreation rooms, bunks and cloakrooms have also been set up.

Thanks to the prefabricated concrete components, the building shell was completed in just 13 months. The heaviest components, weighing up to 35 tonnes, were assembled efficiently using our 750 tonne crawler crane.

We are proud of our team and everyone involved in making this fantastic project possible!

YouTube

By loading the video, you agree to YouTube's privacy policy.
Learn more

Load video

More news from Emil Egger

emil-egger-esk-30-spezialkran-saftpresse-9-2
EGGER special crane in use for machine insertion in the tightest of spaces
When there is no room for compromise, our ESK 30 special crane comes into play! The fully electric crane masters even tricky lifting tasks in halls and production facilities with flying colors – such as lifting a 16-ton juice press for Holderhof Sulgen AG.
Learn more
emil-egger-schwergut-kranarbeiten-pneukran-abfallanlage-99
Crane work with 650-tonne pneumatic crane for sustainable waste recycling
EMIL EGGER has developed for the operator GEVAG – SMARTE ENERGIE. FROM WASTE. – large plant components, including a filter housing with hoppers and steel fixtures. Our 650-tonne mobile crane with 38.5 m luffing jib was used.
Learn more
default
From transportation to installation – EGGER supports the bridge project in all phases
In the night of 04. The third and final major crane lift as part of the bridge replacement project in Münchenstein was successfully completed on August 5, 2025: The new underwater bridge weighing 255 tons was precisely lifted into place with a 1000-ton crawler crane at a radius of 53 meters.
Learn more
emil-egger-kranarbeiten-spezialtransport-windkraft-andermatt-47
Special transportation of wind turbines from Basel to Andermatt
Four new ENERCON wind turbines commissioned by EW Ursern and Energie Uri (EWA) for Andermatt are really getting things moving in the canton of Uri – and our team from EMIL EGGER was right in the middle of it all.
Learn more
default
Special transportation of wind turbines from Basel to Andermatt
Four new ENERCON wind turbines commissioned by EW Ursern and Energie Uri (EWA) for Andermatt are really getting things moving in the canton of Uri – and our team from EMIL EGGER was right in the middle of it all.
Learn more
emil-egger-esk-30-spezialkran-ara-thalwil-2
EGGER special crane for confined spaces
For the waste water purification plant in Thalwil, our team moved a 3.5 t clarifier screen with a radius of 18 m with millimeter precision – using our ESK 30 special crane.
Learn more
emil-egger-maschine-industrieumzug-polycontact-5
Mikron milling center safely relocated by industrial relocation team
We successfully installed a new Mikron UCP 600 Vario milling center in the basement of the company building of Polycontact AG in Chur.
Learn more
emil-egger-brueckenbau-monthey-1
Successful bridge relocation in Monthey
At the end of June, SBB reached an important milestone for the infrastructure in Monthey: the new SBB bridge over the Vièze was successfully moved – in blazing sunshine and temperatures of over 30 degrees.
Learn more
Spychertransport – Rüfenacht-Worb – Jugendarbeit Worb
EMIL EGGER moves history
In the night from Monday to Tuesday, EMIL EGGER AG was able to realize an extraordinary transport project: The approximately 250-year-old Aebersold warehouse was saved from imminent demolition and transported to its new destination at the Freizeithaus in Worb.
Learn more
emil-egger-spezialtransport-kranarbeiten-bootshaus-104101
Special transport Basel: EMIL EGGER brings 50-ton boathouse to its destination
This week, EMIL EGGER was able to realize a very special project in Basel: The transportation of the new boathouse for the emergency services of the canton of Baselland.
Learn more