before 3 years | EMIL EGGER AG

Excavation, loading and removal of the Polybahn in Zurich

EMIL EGGER - the professionals for rail transports

We are also busy during the week, for example excavating, loading and removing the Polybahn in Zurich. With ETE it goes safely to the revision.
Excavation of the Polybahn in Zurich by EMIL EGGER Heavy Lift Logistics
Excavation of the Polybahn in Zurich by EMIL EGGER Heavy Lift Logistics

More news from Emil Egger

emil-egger-industrieumzug-schwergut-logistik-maschine
Precision and teamwork for machine relocation in Künten
For the packaging and molded parts manufacturer Taracell AG in Künten, we mastered a challenging heavy goods logistics task.
Learn more
1emil-egger-rueckbau-bruecke-hanau-raupenkran-2025-19
Dismantling of the B43 bridge over the DB facilities in Hanau
Work began on December 2, 2024 and is scheduled to be completed by March 2025. The first construction phase had its intensive phase in the last week of December. The second intensive phase will now follow over the next few weeks.
Learn more
emil-egger-muttenz-überfuehrung-kranarbeiten-2
Successful dismantling weekend in Muttenz
Last weekend we were able to complete the crane work for the dismantling of the Grenzacherstrasse overpass in Muttenz.
Learn more
emil-egger-tunnelbohrmaschine-gotthardtunnel-spezialtransport 5
Special transportation of large and heavy parts of a tunnel boring machine
Last week, EMIL EGGER AG delivered two of the largest and heaviest parts of the tunnel boring machine for the second tube of the Gotthard tunnel.
Learn more
default
Work of art installed in Zurich Werdhölzli
The artwork “Schräg im Gleichgewicht” was created in 1984. It was dismantled in 2014 for the renovation of the entrance area and temporarily stored at Werdhölzli.
Learn more
default
Crane hand in action with the special crane from EMIL EGGER
We had the exciting task of moving the façade supports with our special ESK 30 crane and the attached crane hand with millimeter precision on a nearly completed building.
Learn more
emil-egger-muttenz-freulerbruecke-5
Dismantling of Freuler Bridge Muttenz
In the night from 8 to July 9, the first stage of the crane work for the dismantling of the Freuler Bridge came to an end in Muttenz.
Learn more
emil-egger-kornwestheim-brueckenbau-6
Swiss 1000 t crawler crane lifts bridge sections in the greater Stuttgart area
At the beginning of May, we were involved in the dismantling of the “Great Pflugfelder Bridge” in Kornwestheim. The truss bridge dates back to 1917 and crosses the tracks of an important shunting and transhipment yard in the greater Stuttgart area.
Learn more
emil-egger-industrieumzug-maschinentransport-4
Industrial relocation team in action for Allegra Passugger Mineralquellen AG
Our industrial relocation team recently had the task of temporarily storing, transporting, lifting and positioning a bottle washing and filling system for Allegra Passugger Mineralquellen AG.
Learn more
emil-egger-basel-terminal-rheinhafen-kleinhuenigen-2
Efficient construction site logistics
Rhenus Port Logistics is investing in a new transshipment terminal in the Rhine port of Basel-Kleinhünigen. EMIL EGGER was entrusted with the logistics of the prefabricated concrete elements.
Learn more