Both access to the site and the space for the assembly of the crane luffing jib were severely restricted. The stroke was also quite tricky due to the tight conditions. Thus, even a fence had to be removed in advance to ensure access for the necessary fleet.
There was a great interaction between the ETE sites in St. Gallen and Avenches for this order. The project managers, dispatch and the drivers all gave full performance.
Many thanks to all involved for the smooth execution and great teamwork.