before 5 years | EMIL EGGER AG

Construction of infrastructures for renewable energies by EMIL EGGER

Filling station of the future by kvyreen

Especially in the field of renewable energy, EMIL EGGER is a reliable partner when it comes to logistical support in setting up infrastructures. With our professional and high-performance general cargo and heavy lift logistics, these plants can only be put into operation. So too kvyreen (Quirin): The gas station of the future. Battery electric vehicles can thus be charged immediately with guaranteed renewable energy. The Swiss company H2 Energy integrated all the technology in a closed cube. Via a fuel cell, an inverter and a charging station, the green hydrogen is made available for fast charging.
EMIL EGGER is a reliable partner for the development of infrastructures for renewable energies
EMIL EGGER is a reliable partner for the development of infrastructures for renewable energies

The location-independent solution, which does not burden the local power grid, is currently located at Oberstrasse 141 in St. Gallen. The test phase will be accompanied by a scientific study conducted by Empa. The Federal Office of Energy supports innovation. H2 Energie is cooperating with Avia Osterwalder St. Gallen and ABB Switzerland.

You are currently viewing a placeholder content from YouTube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

More Information

More news from Emil Egger

Bild 1
750-metric-ton crawler crane for the new SBB Aare Bridge in Solothurn
With cantilevers extending up to 108 meters, EMIL EGGER supported the assembly of the new steel structure for the SBB Aare Bridge in Solothurn. A total of eleven bridge elements, weighing up to 71 metric tons each, were hoisted into place.
Learn more
714026805_Biel_Heidenweg_Brücke_Einhebung_150dpi_0790_D
Tandem lift using a 650-tonne and a 450-tonne mobile crane
Following the successful dismantling in June, the next milestone in the refurbishment of the Heideweg Bridge in Biel was reached in September: the new central section of the bridge was hoisted into place over Bernstrasse at the Brüggmoos junction.
Learn more
emil-egger-bahnbrücke-wetzikon-sbb-b
LR 11000 lifts new railway bridge into place in Wetzikon
The EMIL EGGER Group’s most powerful crawler crane was deployed during the replacement of the railway bridge over Usterstrasse in Wetzikon. After lifting two abutments, each weighing 210 tonnes, the new steel bridge, weighing 160 tonnes, was precisely positioned at its intended location.
Learn more
default
1,200-tonne railway underpass in Niederbipp postponed
As part of the refurbishment of the Scharnageln–Niederbipp section of the Aare Seeland mobil AG railway line, EMIL EGGER was able to support a challenging project involving heavy-lift logistics, lifting and relocation technology.
Learn more
emil-egger-spezialtransport-säntis-schwebebahn-1
Construction of the new Säntis cable car
The first cables for the new Säntisbahn have arrived at Schwägalp – and we were able to play a part in this special transport operation.
Learn more
Bild 1v5
Demolition work using the 450-metric-tonne mobile crane in Biel
During the night of 16 to 17 June 2026, EMIL EGGER was involved in the dismantling of the Heideweg Bridge in Biel. As part of the ongoing renovation work, the central section of the bridge over Bernstrasse at the Brüggmoos junction was dismantled.
Learn more
emil-egger-transport-flugzeug-cellsius-4
EMIL EGGER transports the H2-Sling hydrogen-powered aircraft
For the Swiss innovation project CELLSIUS Aero, EMIL EGGER was entrusted with an extraordinary transport mission: The H2-Sling, a hydrogen-powered experimental aircraft, was transported from Dübendorf to Payerne.
Learn more
26-05-12-3214
Precise crane operation in winter conditions
As part of the construction of the new Säntis suspension railroad, EMIL EGGER was once again able to make a contribution to an important infrastructure project in Eastern Switzerland. Together with the fitters from Garaventa, the existing cabins of the Säntis suspension railroad were safely lifted down into the valley.
Learn more
emil-egger-reussbruecke-kranhub-thb-spezialtransporte-1
Precision in time with rail traffic
On the first weekend in May, EMIL EGGER successfully completed another important construction phase on the Reuss Bridge in Lucerne. The listed railroad bridge – over which around 200 trains pass every day – is currently being extensively renovated. The last major renovation was carried out in 1987.
Learn more
emil-egger-seftausteg-bern-4
Efficient lifting technology from EMIL EGGER for bridge renovation in Bern
The Seftau footbridge in Felsenau near Bern was successfully excavated on April 28, 2026. The 53-metre-long foot and cycle bridge connects the municipalities of Bern and Bremgarten bei Bern and is currently undergoing extensive renovation.
Learn more